CampbellReith was appointed to provide full engineering services for two large five storey buildings that are connected with a podium garden at second floor level. This includes a carpark from ground to first floor and office/laboratory from second to fourth floor. →
The new 11,700m2 centre is to be constructed at The Royal Marsden’s Sutton site and will replace some of the more dated facilities and infrastructure with modern, purpose-built spaces, helping the Trust to save more lives by diagnosing cancer earlier. →
The works for the new Energy Centre at Kensington Olympia are well underway, with the props installed and basement construction in full swing. →
At 132-hectares, this significant site it being redeveloped to provide a new community of 2,500 homes, a primary school, neighbourhood centre, retail space and elderly care facility. →
This new development sits on the corner of the High Street in East Ham and is surrounded by existing buildings on two sides. A former Co-Operative retail building, the proposed development will provide 98 new homes. →
CampbellReith has provided multi-disciplinary engineering advice to Big Yellow for almost 20 years. This Guildford site was in a disused state and had a significant industrial history. →
For the next three years our geotechnical team will be providing expert advice on the management of the Borough’s soft cliff coastline to protect residents, property, infrastructure and valuable public amenities. →